Sea Breeze 2
29 Jul 2026

Sea Breeze 2

59%Overall▲ +3% · vs previous visit

Main video

Engineering Report

The Sea Breeze 2 project was visited on July 29, 2026, with an overall completion rate of 59%. Current work is focused on completing masonry and internal plastering, with significant progress in plumbing and electrical installations within the units. The concrete structure is in its final stages at 90%, while initial finishing works (plastering) are clearly visible across several sectors.
Detected changes
Concrete Structure and Masonry95%

Structural framework completed for most blocks, with ongoing internal partition masonry using cement bricks and closing of openings.

Finishing Works (Plastering)90%

Execution of splash-coat (spraying) and commencement of internal plastering for some rooms and corridors, with construction materials (cement and sand bags) visible on-site.

Plumbing and Electrical Works85%

Installation of PVC piping and conduits in bathrooms, along with the routing of orange electrical conduits in walls and ceilings.

General Site and Facades90%

External facades remain at the brick and concrete stage, while the general site shows organized construction materials with the temporary project fencing still in place.

Progress reading

The visual evidence aligns with the reported completion rates; the plastering and internal installations reflect the progress in plumbing (60%) and finishing (45%). The electrical work remains steady at 40%, as seen in the ongoing initial wiring without moving to the pulling or final installation stages.

vs previous visit

Compared to the June visit, there is a clear progress in closing architectural openings in the buildings, along with an increased intensity in internal plastering works and service installations (plumbing and electrical) that were incomplete in previous photos.

Expected next milestones

Completion of internal plastering works, commencement of waterproofing for bathrooms, and the start of preparing external facades for plastering or cladding works.

Progress

0%OverallAverage item progress
0/4 completeavg ▲ +3%
Plumbing Works▲ +5%
0%
Electrical Works
0%
Finishing Works▲ +5%
0%
Concrete Works
0%

Drone Photography

On-site Photography

360 Video