Sea Breeze AlHamra
Main video
Engineering Report
Detected changes
Completion of exterior plastering, painting, and installation of decorative metal pergolas on the roof, with scaffolding remaining in some sections for final cleaning works.
Installation of marble and porcelain for floors and walls, completion of suspended gypsum board ceilings with AC and lighting cutouts, and installation of sinks and sanitary fixtures.
Installation of recessed spotlights and electrical switches, completion of concealed AC ducting, with final wiring visible at connection points.
Full waterproofing of the roof and installation of water tanks, with some construction debris remaining in the vacant lot adjacent to the building.
Progress reading
The visual images align with the declared completion rates, as the work has progressed from the structural stage (as seen in previous photos) to the full final finishing stage. The increase in electrical works (+5%) is evident through the installation of terminal ends and lighting.
vs previous visit
The difference is substantial; previous photos showed the building during the concrete structural and blockwork stages without plastering, whereas the current photos show a building with 100% completed facades and interior finishes.
Expected next milestones
Complete removal of external scaffolding, general site cleaning, and the commencement of final handover and commissioning procedures.
Progress
Before and After Comparison
After
Before